
New Carbon Reduction Case Study!
We are thrilled to share more about the carbon reduction strategies used at Pepper Construction Group’s new Cincinnati headquarters. A case study, prepared by Pepper Construction Group, with CMTA & support from our very own Brett Match was included in the
Carbon Leadership Forum’s 2025 Embodied Carbon Reductions Built Project Case Study Collection!
Read the full case study here: https://carbonleadershipforum.org/2025-embodied-carbon-reductions-built-project-case-study-collection/