Bethany School Campus Master Plan

  • Bethany School
n

Bethany School Campus Master Plan

Before building ideation or construction emersion DESIGN created a building Master Plan. The team decided on the placement and phasing requirements for a new grades 3-8 building, K-2 building, natural playscape, cafeteria, and administrative space.
The same reasons this campus is beloved by so many also made this campus a challenge to build on. The topography is varied and a majority of flat parcels were already developed. The new buildings are sympathetic to the grade, resulting in the staggard appearance of the 3-8 classroom building and sloped playscape area.

The final Master Plan for Bethany School capitalizes on the existing assets while positioning the school and campus for decades to come. The overall plan retains the campus-like feel.
The buildings preserve the homey atmosphere that was treasured when classes took place in residential cottages. Larger classrooms supported by flex areas, appropriate technology, and operable walls elevate Bethany School's ability to teach today’s learners. A consolidation of academic core buildings from five to two enhances security. Engagement with nature throughout the day continues to be supported as children travel to different buildings, via natural outdoor pathways for specials, like art, music, PE, and lunch.

1st Net-Zero Energy School Building in Midwest (pending)

2nd Most Energy Efficient School Building in USA (pending)

LEED Platinum Certification

Crime Prevention Through Environmental Design

108 Geothermal Exchange & Solar Panels

Master Plan

Phased Construction

Student-Centered Campus

Natural Playscape

Client
Community of the Transfiguration
location
Glendale, Ohio
year completed
2016
energy use intensity
Designed 17 kBtu/ft2
Project contact
christie boron
project manager
513 841 3092